FXDR131
Well-known member
Good sign!Yes, SYNC4 v4.0.21297
Sponsored
Good sign!Yes, SYNC4 v4.0.21297
Same. Still seems they are holding the trucks for something. Perhaps my dealer will email me tomorrow.Good sign!
I am from the 1/17 build week. Today was my blend date, no modules yet, but I just checked my window sticker and it has todays updated date at the bottom. It was reading 1/11 date up until an hour ago. Good sign maybe?You can - sometimes the update is not something visible on the sticker.
Latest build list with some updates from today. Here's hoping things are too delayed if the rumors are true that there may be another chip shortage dragging out build and ship dates.
User Name Destination Trim Plant Order Date Blend Date Seq. # Shipped Method Delivery ETA Delvr'd Recv'd TowMore45 TX XLT 11/10/21 1/10/22 No catskills837 MI Lariat 1/10/22 No Oxford_402A_tremor CAN Tremor DRB 6/21/21 1/10/22 No FXDR131 NH Lariat DRB 09/11/21 1/10/22 810/1197 No mrpkb IL Limited DRB 10/14/21 1/10/22 No parkerdog IA XLT KAN 10/28/21 1/10/22 624/1376 CONVOY 1/26/22 No Bigguy214 MI XLT 10/22/21 1/11/22 768/869 No Viper MD Limited DRB 10/28/21 1/11/22 No BCM FL Platinum DRB 10/23/21 1/12/22 312/445 CONVOY FLPB FL Lariat DRB 11/02/21 1/12/22 CONVOY No Jeff1024 KY Platinum DRB 11/08/21 1/12/22 No fishpick NY Lariat DRB 12/01/21 1/12/22 No 2022Tremor ON, CA Tremor DRB 12/20/21 1/12/22 No MartinKubota ON, CA XLT DRB 10/04/21 1/13/22 1219/2393 RAIL 2/7/22 No BigEd290 GA Platinum DRB 10/26/21 1/13/22 1444/2393 CONVOY No https.j0n ON, CA XLT DRB 11/03/21 1/13/22 2106/2393 No blankkhaos MI XLT DRB 11/11/21 1/13/22 No manias CAN Lariat KAN 04/06/21 1/14/22 No MtborbF-150 AL, CA Lariat DRB 10/14/21 1/13/22 1433/2393 RAIL No daryl3 ON, CA XLT DRB 10/15/21 1/14/22 39/1196 RAIL 1/27/22 No F150inSD SD Lariat DRB 10/16/21 1/14/22 448/1196 RAIL No f150lifer75 KS Lariat DRB 10/28/21 1/14/22 1037/1196 No Buzzard3142 PA Tremor DRB 10/29/21 1/14/22 868/1196 CONVOY No Capage58 TX Limited DRB 11/02/21 1/14/22 829/1196 RAIL No Mike2019SCrew TN XL KAN 11/12/21 1/14/22 960/1046 1/24/22 No KS HWS KS Lariat DRB 12/07/21 1/14/22 1098/1196 No corkscrew ON, CA Lariat DRB 10/14/21 1/15/22 817/1196 RAIL No Panzer ON, CA Tremor DRB 10/09/21 1/15/22 79/1789 RAIL No AMB_Tremor ON, CA Tremor DRB 06/15/21 1/16/22 CONVOY No klvanzu IL Lariat DRB 09/15/21 1/16/22 No rogerj?? NH XL KAN 10/30/21 1/16/22 No BlueStreak MI XLT DRB 11/02/21 1/16/22 No dwigit_99 MO Lariat DRB 11/12/21 1/16/22 1633/1789 CONVOY No
We can't always tell why a sticker updated, but with the sticker system having been down for a month+, any sticker is a good sign for us.I am from the 1/17 build week. Today was my blend date, no modules yet, but I just checked my window sticker and it has todays updated date at the bottom. It was reading 1/11 date up until an hour ago. Good sign maybe?
Same here! Contrary to what my sales rep said, the tracker says it’s still in production since the 13th with an estimated delivery date of 02/28….oh boy. I hope the sales rep had more accurate info lolFYI, I got my ford tracker on their website to work this morning!
Mine says in production yesterday, but down at the bottom it says ETA 2/14. Sorry man, I’m from the 1/17 thread and might have passed youSame here! Contrary to what my sales rep said, the tracker says it’s still in production since the 13th with an estimated delivery date of 02/28….oh boy. I hope the sales rep had more accurate info lol
As long as its a step in the right direction. Here is what my tracker is reading.From experience that ETA at the bottom and basically anything in the tracker is wrong.
2/28 is last dot of month. 2/14 is half way in month. It’s just variations of rando numbers.
Take it as in production and progress is being made. Anything more than that and you are gonna get a brain aneurysm