Thought I would start a thread to allow some of us slated for build when KC resumes building in June, to compare notes.

For instance, I am seeing a LOT of people on various threads posting that they are scheduled for a 6/14 build (me included)... does anyone know the weekly capacity of the plant in units produced (irrespective of chip and parts shortages)?

Seems to me they have told an awful lot of us our trucks will be built this week.
Sponsored

 

JayceeP

Well-known member
Joined
May 13, 2021
Threads
8
Messages
404
Reaction score
267
Location
CAN
Vehicles
F150
Thought I would start a thread to allow some of us slated for build when KC resumes building in June, to compare notes.

For instance, I am seeing a LOT of people on various threads posting that they are scheduled for a 6/14 build (me included)... does anyone know the weekly capacity of the plant in units produced (irrespective of chip and parts shortages)?

Seems to me they have told an awful lot of us our trucks will be built this week.
Thank you.
KCAP is down this week and next. On another forum, an employee mentioned that they won’t be back to full production until week of June 14 but it’s not what Ford released a couple weeks ago and I don’t know where his info came from aside from him working at the plant.

My original build was April 22. On April 15, my build got reassigned to May 7 and I was immediately sent to plant based on the visibility report so I am “in production.” My window sticker still has a blend date of May 7 so I assume guys like you weren’t sent to the plant before shut down and that’s why your build dates are getting bumped farther out? I am expecting that my truck is built within days of the plant opening because that’s the ETA when you are “sent to plant.”
 

20acrefarms

Well-known member
First Name
Scott
Joined
Mar 17, 2021
Threads
10
Messages
80
Reaction score
56
Location
Enniskillen Ontario Canada
Vehicles
2019 VW Atlas, 2023 F150 XL
Occupation
Industrial Fire Fighter
Same here scheduled for April and then pushed to May 7th with an “in production” and “sent to plant” status and no new build date
 

12Lariat21

Well-known member
First Name
Jonathan
Joined
Mar 23, 2021
Threads
10
Messages
528
Reaction score
599
Location
55374
Vehicles
2021 Lariat 502A
Occupation
Engineering Manager
My order; Lariat 502A
Order Date: 03/15/2021
Blend Date: 04/19/2021
Scheduled to Build Week 04/19/2021
Schedule to Build Day 04/19/2021

So I'm hoping that mine is one of the first to go down the line when it opens back up in June, but I'm certainly not holding my breath on that. I have not heard of any reassigned dates for my truck.
 

Larry Arizona

Well-known member
Joined
Feb 24, 2021
Threads
4
Messages
71
Reaction score
62
Location
Michigan
Vehicles
2018 F150, 2019 F150
I don’t know how I threaded the needle at KC but.....
Screw XLT 302A 3.5EB max tow, special order with $1000 deposit and “A”plan

ordered 2/26
VIN on 3/8
Blend date 4/16 (truck must have been finished on last day)
Arrived at dealer 5/3

66 days from order to my driveway.
 

Sponsored

OP
OP

85Mustangman

Well-known member
First Name
Michael
Joined
Apr 5, 2021
Threads
3
Messages
225
Reaction score
152
Location
Toronto, Ontario
Vehicles
2021 XLT Supercab/ 6.5 box, 2.7, 302A, Antimatter
Occupation
Retired
Thank you.
KCAP is down this week and next. On another forum, an employee mentioned that they won’t be back to full production until week of June 14 but it’s not what Ford released a couple weeks ago and I don’t know where his info came from aside from him working at the plant.

My original build was April 22. On April 15, my build got reassigned to May 7 and I was immediately sent to plant based on the visibility report so I am “in production.” My window sticker still has a blend date of May 7 so I assume guys like you weren’t sent to the plant before shut down and that’s why your build dates are getting bumped farther out? I am expecting that my truck is built within days of the plant opening because that’s the ETA when you are “sent to plant.”
Yeah who knows? I was originally a 5/17 sheduled build date, but never got as far as a window sticker/ blend before the shutdown. I guess that’s why I was rescheduled to 6/14. Good news for you though, at least you have a light at the end of the tunnel, I am still in the dark.

I am still concerned that they have over promised customers for the early weeks of June production wise.
 
OP
OP

85Mustangman

Well-known member
First Name
Michael
Joined
Apr 5, 2021
Threads
3
Messages
225
Reaction score
152
Location
Toronto, Ontario
Vehicles
2021 XLT Supercab/ 6.5 box, 2.7, 302A, Antimatter
Occupation
Retired
I don’t know how I threaded the needle at KC but.....
Screw XLT 302A 3.5EB max tow, special order with $1000 deposit and “A”plan

ordered 2/26
VIN on 3/8
Blend date 4/16 (truck must have been finished on last day)
Arrived at dealer 5/3

66 days from order to my driveway.
Threaded the needle and how... you should buy some lotto tix before your luck runs out!

seriously tho, happy for you! Did you have any shortage stuff? Bed liner, worksurface, wheel liners etc?
 

cjduello

Well-known member
First Name
Chris
Joined
Mar 3, 2021
Threads
2
Messages
49
Reaction score
30
Location
Fenton, MO
Vehicles
2021 Lariat SCREW EB 502A Sport FX4
My order: Lariat 502A
Order Date: 01/21/2021
Original Blend Week: 03/22/2021
Rescheduled to Build Week: 04/05/2021
Scheduled to Build Day: 04/10/2021
Rescheduled to Build Week: 05/03/2021
Scheduled to Build Day: 05/07/2021
Sent to Plant: 04/15/2021
ETA to Dealer: 06/06/2021

Sitting in production purgatory since... with KC down this week and next, I see June 6 as unlikely, but I remain hopeful...
 

qwmast

Active member
Joined
Apr 1, 2021
Threads
1
Messages
26
Reaction score
17
Location
Wisconsin
Vehicles
2021 F150 XLT
Occupation
Engineer
Hi all, my order was placed 3/30 and initially was slated for a 5/24 build day. The most recent build day I was assigned was during the week of June 28th. Seems to me there is an awful lot scheduled during June as well. Here's to hoping they have were able to stockpile chips in KC to help complete these orders. Oh and my status is at order confirmed still, not sent to plant just yet: Hopefully that happens mid-June.
 

stangsandatruck

Well-known member
First Name
Chris
Joined
Mar 15, 2021
Threads
5
Messages
106
Reaction score
105
Location
NE Pennsylvania
Vehicles
2015 Mustang GT, 2021 F150 XLT 302A
Occupation
Software Engineer
Just saw that the KC plant will not re-open until the week of 6/14. At that point they will operate on a reduced schedule so some trucks are gonna get pushed out further.
 

Sponsored


OP
OP

85Mustangman

Well-known member
First Name
Michael
Joined
Apr 5, 2021
Threads
3
Messages
225
Reaction score
152
Location
Toronto, Ontario
Vehicles
2021 XLT Supercab/ 6.5 box, 2.7, 302A, Antimatter
Occupation
Retired
Just saw that the KC plant will not re-open until the week of 6/14. At that point they will operate on a reduced schedule so some trucks are gonna get pushed out further.
Thanks for sharing this! if i understand correctly:

- Dearborn Truck Plant and Kansas City Assembly Plant – truck line – will be down the weeks of May 31 and June 7 and will operate on a reduced schedule the week of June 14

So this one is going to affect the Dearborn guys as well.

This makes the question even more of interest...

Does anyone know the unit capacity per week (or better, PER SHIFT) of the Dearborn plant and the KC plant?
 

Seavee33

Well-known member
Joined
Apr 16, 2021
Threads
6
Messages
161
Reaction score
80
Location
Miami, Fl
Vehicles
'13 F-150, Ordered 2021 Lariat
Occupation
Electrician/ Project Manager
Just saw that the KC plant will not re-open until the week of 6/14. At that point they will operate on a reduced schedule so some trucks are gonna get pushed out further.
I've heard the same. let's see what happens. I've been pushed back three times already at KC with no window sticker or sent to plant yet. I dont even know what my next build week will be.
 

Djlee1592

Well-known member
First Name
Dave
Joined
Jan 19, 2021
Threads
9
Messages
226
Reaction score
163
Location
Upstate New York
Vehicles
2021 F-150
Occupation
industrial mechanic
In the same boat as some other guys. Kept getting pushed. Blend date of 5/6. Order was sent to plant and tracker shows "in production" currently. Order was placed on 1/21/21.
 

JayceeP

Well-known member
Joined
May 13, 2021
Threads
8
Messages
404
Reaction score
267
Location
CAN
Vehicles
F150
My order; Lariat 502A
Order Date: 03/15/2021
Blend Date: 04/19/2021
Scheduled to Build Week 04/19/2021
Schedule to Build Day 04/19/2021

So I'm hoping that mine is one of the first to go down the line when it opens back up in June, but I'm certainly not holding my breath on that. I have not heard of any reassigned dates for my truck.
Does your window sticker still have that same blend date?
 

UNIKRN150

Banned
Banned
Banned
First Name
Bob
Joined
Mar 20, 2021
Threads
9
Messages
695
Reaction score
765
Location
Pacific North West
Vehicles
Pinto SE 4x4
I received my build date (June 7) the day before they announced all the closures and the June 7 reopening date.

Since then I've seen variations on the closures such as "1/2 shifts, building Transits only, etc...
But the June 7 opening date has remained consistent.

?