I received my build date (June 7) the day before they announced all the closures and the June 7 reopening date.

Since then I've seen variations on the closures such as "1/2 shifts, building Transits only, etc...
But the June 7 opening date has remained consistent.

?
That’s what I thought as well UNIKRN150, but this story seems to suggest KC won’t open as expected on 6/7!

https://www.wdrb.com/in-depth/ford-...cle_d1dc72c0-b8c3-11eb-aba9-2f10c4127fb2.html

** not sure this story is confirmed though**

sorry to burst your bubble if it is true!
Sponsored

 

UNIKRN150

Banned
Banned
Banned
First Name
Bob
Joined
Mar 20, 2021
Threads
9
Messages
695
Reaction score
765
Location
Pacific North West
Vehicles
Pinto SE 4x4

12Lariat21

Well-known member
First Name
Jonathan
Joined
Mar 23, 2021
Threads
10
Messages
528
Reaction score
599
Location
55374
Vehicles
2021 Lariat 502A
Occupation
Engineering Manager
Does your window sticker still have that same blend date?
Yeah I keep checking it every week, and the Blend date has remained 220210419
 

cjduello

Well-known member
First Name
Chris
Joined
Mar 3, 2021
Threads
2
Messages
49
Reaction score
30
Location
Fenton, MO
Vehicles
2021 Lariat SCREW EB 502A Sport FX4

Sponsored

Uncle_Booty

Well-known member
First Name
Glen
Joined
Apr 6, 2021
Threads
5
Messages
181
Reaction score
123
Location
Knoxville, TN
Vehicles
2023 F150 XLT 302A SCrew 5.0 157" 4x4
Occupation
Commercial Truck Leasing
My order:

XLT 301A 157" 4x2 5.0 Antimatter/Carbonized Gray

Ordered 4/2
Priority 10
VIN received 4/13 (1FTEW1C59MKE15765)
Build week of 6/7 (per Pioneer74's last update)
No build "Day" yet
No window sticker yet
No ETA yet

The only constraint item from the most recent list is the spray-in bed liner.

I figure there's no point in bothering my dealer unless I get to the first few days of June and there's no changes to the tracking info nor a window sticker available.
 

Merccat

Well-known member
First Name
Ryan
Joined
Apr 4, 2021
Threads
6
Messages
581
Reaction score
456
Location
California
Vehicles
2021 Space White Lariat SCAB 5.0 4x2
Well darn, my June 7th build week is now toast. It will be interesting to see where I land once they restart.

lariat supercab 5.0, no liner or wheel liner but did add work surface and pro power 2kw (I haven’t heard of this being a constraint but I’m sure there are chips involved with that option).... oh yeah and CoPilot Assist 360 (more chips). Ordered 3/27, SpaceWhite is what landed me in KC (may have anyway but that sealed my fate).

Looks like my PCO will for sure vaporize and maybe my school discount as well.
 

PoppyE

Member
First Name
Brady
Joined
May 1, 2021
Threads
0
Messages
15
Reaction score
9
Location
Canada
Vehicles
2020 F-150
Occupation
Trucker
Thanks for sharing this! if i understand correctly:

- Dearborn Truck Plant and Kansas City Assembly Plant – truck line – will be down the weeks of May 31 and June 7 and will operate on a reduced schedule the week of June 14

So this one is going to affect the Dearborn guys as well.

This makes the question even more of interest...

Does anyone know the unit capacity per week (or better, PER SHIFT) of the Dearborn plant and the KC plant?
I believe 1500-1600 trucks per day when Dearborn is running normal
 

Sponsored


Merccat

Well-known member
First Name
Ryan
Joined
Apr 4, 2021
Threads
6
Messages
581
Reaction score
456
Location
California
Vehicles
2021 Space White Lariat SCAB 5.0 4x2
Chip supply should ease a bit hopefully in a few weeks:

https://www.nasdaq.com/articles/ren...fire-damaged-chip-plant-by-end-may-2021-04-19

They claimed that they will be back to full production by the end of this month. Hopefully that will include chips for Ford.

edit:
Of course who knows how long from them being to full capacity to the chips then getting to the module makers and them getting to full capacity to then the modules getting to Ford (and anything else in the chain).
 
Last edited:

Seavee33

Well-known member
Joined
Apr 16, 2021
Threads
6
Messages
161
Reaction score
80
Location
Miami, Fl
Vehicles
'13 F-150, Ordered 2021 Lariat
Occupation
Electrician/ Project Manager
So my salesman just texted me with a projected build week of July 19 at KC. Order on 3/11 and been pushed back since
 
Last edited:

Uncle_Booty

Well-known member
First Name
Glen
Joined
Apr 6, 2021
Threads
5
Messages
181
Reaction score
123
Location
Knoxville, TN
Vehicles
2023 F150 XLT 302A SCrew 5.0 157" 4x4
Occupation
Commercial Truck Leasing
So my salesman just texted me with a projected build week of July 19 at KC. Order on 3/11 and been pushed back since
Yeah, I got an update from my dealer early this morning that my build week of 6/7 had updated to a build day of 6/22 and then reverted to a build week of 7/5 yesterday.
 

JayceeP

Well-known member
Joined
May 13, 2021
Threads
8
Messages
404
Reaction score
267
Location
CAN
Vehicles
F150
My May 17 window sticker still has bend date of May 7 but this evening my ETA delivery date has finally changed from June 16 in the tracker to a generic 1990-01-01 date. All I know is my order was sent to plant on April 15 and in production.
 

20acrefarms

Well-known member
First Name
Scott
Joined
Mar 17, 2021
Threads
10
Messages
80
Reaction score
56
Location
Enniskillen Ontario Canada
Vehicles
2019 VW Atlas, 2023 F150 XL
Occupation
Industrial Fire Fighter
My May 17 window sticker still has bend date of May 7 but this evening my ETA delivery date has finally changed from June 16 in the tracker to a generic 1990-01-01 date. All I know is my order was sent to plant on April 15 and in production.
exact same dates as me