mikey1299
Active member
- Thread starter
- #1
I got a VIN and build date of 7/11 on 6/2. Since then I have been bumped to 8/1. Since I have a VIN, what are the chances of it not getting built before the 2022 are done in Oct.? Since the order bank for 2023 opens before mine is currently scheduled to get built, does it make sense to put in an order for a 2023 in case the 2022 never gets built or does the 2022 somehow get rolled into a 2023?
Sponsored