This is ?. Welcome to the week!Hey Guys, Looks like I'm joining your week from 11/29. Thanks to @70Mach1 for starting this thread.
I kept a list of trucks on the 11/29 thread similar to what @pkinneb was keeping on the 11/1 thread.
I've gathered some info from our builds and posted below. Let me know if I missed something.
Dest is Delivery Destination (dealership). I'm in TN and I'm buying from Koons in VA, hence VA for my truck.
Plant is either DRB - Dearborn, or KC - Kansas City
Trim is XL, XLT, etc.
Ordered is your original order date (if you had a 21 converted to a 22 for example)
Build is you build week (now) and then specifically your build day (later). That will change to a Built date when your truck is done.
Shipped is when it leaves production.
Del ETA is when you first get that info from the trackers. Hopefully Delivered, when it arrives at the dealer, turns out to be much sooner than the Del ETA.
If you ordered non-Ford parts (wheel well liners, spray in liner, etc.), those are marked with * after the user name. Those seem to take 1-5 days per the 11/1 builds to get to the shipped date, after the build date.
If you have a KR, or Plat, let me know if you also ordered Adaptive Steering (AS). That was a known delay on the 11/3 schedule notes if you did not order that option.
Work Surface (WS) was recently noted by one sales rep to cause a delay. Not sure if this is true, but I figured I'd track it, so let me know if you ordered that.
I believe these should all be 2022 models. If you are having a 2021 built instead, that would of interest.
Hopefully this list will help us see when our trucks may arrive by watching others on the same list. It should also be helpful to builds in other weeks in anticipating their deliveries.
Good luck to us all!
User Name Dest Plant Trim Ordered Build/Built Shipped Del ETA Delivered 70Mach1 WS Lariat 9/2 12/13 TN Rotty *AS WS VA DRB Plat 10/2 12/13 futuretrunks OK 11/17 12/13 Landon CA Trem 12/13 Txm TX 12/13 *Spray in Bedliner, etc. AS - Adaptive Steering WS - Work Surface
My plant is Dearborn and I have the work surface. My destination is IA I ordered from Granger and live in NH. I did not order any of the Ford accessories to not delay the build.