Does anyone know if the Auto Stop and/or the Interior work surface is still causing delays. I have a second Platinum ordered with Auto Stop, I am wondering if I need to delete that.
Sponsored

 
OP
OP
91f150jb

91f150jb

Active member
First Name
Jeffrey
Joined
Feb 2, 2021
Threads
1
Messages
36
Reaction score
35
Location
30062
Vehicles
2022 F150 King Ranch, 2007 Mark LT, 1991 F150 XLT
Occupation
CFO
Does anyone know if the Auto Stop and/or the Interior work surface is still causing delays. I have a second Platinum ordered with Auto Stop, I am wondering if I need to delete that.
Mine has both so I'm thinking it is ok. I'm scheduled for the week of 3/07
 

txjustin

Active member
First Name
J
Joined
Jun 10, 2021
Threads
1
Messages
29
Reaction score
34
Location
Texas
Vehicles
None at the moment
Got an email my ordered bumped to 3/14 week...
 

krj1053

Well-known member
First Name
Kyle
Joined
Dec 9, 2021
Threads
2
Messages
79
Reaction score
69
Location
Fort Worth, Texas
Vehicles
2013 Lariat F-150

RMQ

Well-known member
First Name
Ross
Joined
Sep 19, 2021
Threads
2
Messages
104
Reaction score
68
Location
Denver
Vehicles
F150
Got bumped to this week from a 2/28 build week.

Ordered 12/22 and am now scheduled to be built 3/9/22.

Have a Tremor 402a order.
 

Sponsored

Teague

Member
First Name
Teague
Joined
Feb 10, 2022
Threads
0
Messages
12
Reaction score
10
Location
Durango, CO
Vehicles
F150 Powerboost on order
Occupation
Construction
For the folks who were originally assigned to this build week, what do you think the chances of us staying in this build week are with the plants scaling back? Do you think they'll preference certain trims/powertrains Such as Lariat and above?
 

Belgian Son

Member
First Name
Jim
Joined
Feb 5, 2022
Threads
0
Messages
9
Reaction score
7
Location
Spring Lake, MI
Vehicles
2003 F-150 King Ranch, 2022 F-150 XLT
Occupation
Plant Manager
For the folks who were originally assigned to this build week, what do you think the chances of us staying in this build week are with the plants scaling back? Do you think they'll preference certain trims/powertrains Such as Lariat and above?
Well, my XLT 4x4 with a 302 trim package ordered on 1/13 was originally assigned this build week, but my dealer shows it scheduled now for 3/14. Your results may vary...
 

krj1053

Well-known member
First Name
Kyle
Joined
Dec 9, 2021
Threads
2
Messages
79
Reaction score
69
Location
Fort Worth, Texas
Vehicles
2013 Lariat F-150
My 402 Tremor was pushed from 3/7 to 3/14
 

warp7647

Member
First Name
Michael
Joined
Jan 20, 2022
Threads
0
Messages
10
Reaction score
4
Location
Florida
Vehicles
F-150
Occupation
Engineer
I ordered back in September 2021. Platinum hybrid w/fold flat work surface and max recline seats. Perhaps it's the max recline seats holding mine up - dealer did say it would add time. Anyone else have experience with the max recline seat delaying a build? At this point, with Kansas shutting down again, I'm starting to wonder if I'm even going to get a 2022; I bet I'll be pushed into a 2023 model...
 

TN Rotty

Well-known member
First Name
Mike
Joined
Sep 21, 2021
Threads
1
Messages
1,058
Reaction score
1,002
Location
Mid - TN
Vehicles
2022 F150 Crew Cab Plat 6.5'
I ordered back in September 2021. Platinum hybrid w/fold flat work surface and max recline seats. Perhaps it's the max recline seats holding mine up - dealer did say it would add time. Anyone else have experience with the max recline seat delaying a build? At this point, with Kansas shutting down again, I'm starting to wonder if I'm even going to get a 2022; I bet I'll be pushed into a 2023 model...
I ordered a 2022 platinum hybrid with interior work surface and max recline seats on 10/2. It arrived mid January at the dealer.

When did your order go in and was it for a 21 or 22?
 

Sponsored


s.v.t.

Well-known member
First Name
Jake
Joined
Nov 30, 2021
Threads
11
Messages
226
Reaction score
134
Location
Missouri
Vehicles
Building..
Scheduled for 3/7 build:

Ordered 12/14
SCrew Iconic Lariat w/ 502a
3.5 EB
BAP
FX4
360 Active 2.0 w/ Prep
Bed Utility Package
36 gallon tank
Received an email today stating my build start date is getting pushed to 3/14.
 

Teague

Member
First Name
Teague
Joined
Feb 10, 2022
Threads
0
Messages
12
Reaction score
10
Location
Durango, CO
Vehicles
F150 Powerboost on order
Occupation
Construction
I feel like every day I don't get notified of my build getting bumped is dodging a bullet. I guess even if it does get built the week of 3/7, it could still sit in a lot for weeks without chips.
 

Dfc41889

Well-known member
First Name
Dale
Joined
Jan 20, 2022
Threads
0
Messages
102
Reaction score
118
Location
Huntsville, AL
Vehicles
20 Sierra AT4 HD (Trade) - 22 F150 Plat (Ordered)
Occupation
Senior Financial Manager - CPA
Ford’s order site says all parts necessary for completion are secured when you receive a build date. So your truck should not be sitting waiting on anything if you have received your build date and VIN. The build dates could always shift due to JIT parts deliveries with the trucker protests, but you should have the chips for your truck reserved for your truck. I ordered my Platty early November and it is scheduled for 3/7 build week.
 

Dfc41889

Well-known member
First Name
Dale
Joined
Jan 20, 2022
Threads
0
Messages
102
Reaction score
118
Location
Huntsville, AL
Vehicles
20 Sierra AT4 HD (Trade) - 22 F150 Plat (Ordered)
Occupation
Senior Financial Manager - CPA
Does anyone know if the Auto Stop and/or the Interior work surface is still causing delays. I have a second Platinum ordered with Auto Stop, I am wondering if I need to delete that.
My dealer deleted auto stop on my 22 which makes me really happy because I hate auto stop.
 

Dfc41889

Well-known member
First Name
Dale
Joined
Jan 20, 2022
Threads
0
Messages
102
Reaction score
118
Location
Huntsville, AL
Vehicles
20 Sierra AT4 HD (Trade) - 22 F150 Plat (Ordered)
Occupation
Senior Financial Manager - CPA
I ordered back in September 2021. Platinum hybrid w/fold flat work surface and max recline seats. Perhaps it's the max recline seats holding mine up - dealer did say it would add time. Anyone else have experience with the max recline seat delaying a build? At this point, with Kansas shutting down again, I'm starting to wonder if I'm even going to get a 2022; I bet I'll be pushed into a 2023 model...
I ordered Nov 2021 with a build date for 3/7 on a Platty with max recline, 5.0, Michigan build, max tow, 701a, etc… checked mostly every box except Fx4 since I’m doing coil overs anyways, CCD stuff, and got rid of spray liner and wheel well liners for after market since the dealer said that would delay it significantly.