Twistingtommy
Member
- Thread starter
- #1
Hello All!
I want to get feedback from everyone here. I have a F150 order date of 7/1, It has been assigned a build date of 8/19 and went into production 8/20, It had a ETA of 9/20 delivery date. Over the week end it jumped to 10/31 ETA. Any Ideas what would of caused this? I figured once it made it into production it might take a week or two to build but now I am confused. I have contacted FP and they have never been able to give me any details about anything. I had to push to get the Vin from them. Anyways can you guys give me some details. It seems some of you know all this information that I am over here like how did you get that info. I was told by a member here it is at the Dearborn facility also.
Dealer said it was probably because of the spray in liner, I can accept that taking a little bit but not adding a month and 10 days to the process.
Thanks for anyones help!
Vin- 1FTFW1ED5MFC42036
F-150 Lariat Powerboost Crewcab, Antimatter Blue 4x4
I want to get feedback from everyone here. I have a F150 order date of 7/1, It has been assigned a build date of 8/19 and went into production 8/20, It had a ETA of 9/20 delivery date. Over the week end it jumped to 10/31 ETA. Any Ideas what would of caused this? I figured once it made it into production it might take a week or two to build but now I am confused. I have contacted FP and they have never been able to give me any details about anything. I had to push to get the Vin from them. Anyways can you guys give me some details. It seems some of you know all this information that I am over here like how did you get that info. I was told by a member here it is at the Dearborn facility also.
Dealer said it was probably because of the spray in liner, I can accept that taking a little bit but not adding a month and 10 days to the process.
Thanks for anyones help!
Vin- 1FTFW1ED5MFC42036
F-150 Lariat Powerboost Crewcab, Antimatter Blue 4x4
- Max Trailer Tow Package
- Ford Co-Pilot360™ Assist 2.0
- 360-Degree Camera Package
- FX4 Off-Road Package
- Power Equipment Group
- Mid 501A
- Pro-power 7.2 Kw Generator
- Twin Panel Moon Roof
- Interoir Work surface
Sponsored
Attachments
-
1.6 MB Views: 127