Cancel that!!Also.. I was scheduled on 3/20, but it does show it "updated" on 4/5. Nothing changed, but some people suggested I call Ford Cust Care and check (if I care to) because likely it's just that the build schedule has been updated to a specific day vs "week of" (on the back-end).
They're not a myth. Can confirm.Congrats!!
I did. Got 5/20 production week. I don't have the PAT, but do have the mythical BAP on my 5.0L Lariat.
Yes... I did not take the 63X option. Truck is being built as described in signature. Re-ordered as Job 2 2/21, scheduled 3/20 for 4/29, locked in to 5/1 build day on 4/5.Still have PAT since you moved up?
Is your window sticker available yet? I checked for mine but it isn’t available yet.Yes... I did not take the 63X option. Truck is being built as described in signature. Re-ordered as Job 2 2/21, scheduled 3/20 for 4/29, locked in to 5/1 build day on 4/5.
The online builder shows up the same when you add the BUP. I'm not sure why it does though. I asked the dealer initially about this and they indicated that it isn't automatically added with the BUP like it shows in the images.My truck is also a job 2 and it’s scheduled for production on 05/13. I didn’t add a bed liner but for some reason the rendering shows I have one maybe I’ll get lucky and they’ll throw one in on “accident” and I get it for free lol.
![]()
![]()
![]()
Just checked... nothing yet.Is your window sticker available yet? I checked for mine but it isn’t available yet.