Tjbev13
Well-known member
I was originally scheduled for the 6/14 build week but didn't get completed until the 22nd so here is some hope for you guys!
Sponsored
From the little I know, your blend is when all the associated parts for your build get loaded on the line and your truck will physically be built the day or two after.My window sticker just updated and still has a 6/24 Blend date. Fingers crossed it gets built tomorrow.
Sweet!Hey guys,
Looks like I’m in the home stretch. Truck shows built as of this morning.
How everyone else is seeing the same on theirs.
![]()
Do you have the FX4 package? The onboard scale isn’t available on the FX4 package from what I’m told.I’m smiling.
Order date 2/16.
Blend date 6/22.
Built date 6/22
Shipped date 6/23
21 days estimated transit to Oregon
Loaded SQ Limited 4X except I left spray in bedliner and Tonneau cover off to avoid downtime and I wanted Line-X and Powertrax anyway. Dearborn
I’m smiling because, from what I’ve read, Job 2 Dearborn builds started 6/14 and Limiteds come with CC Dampers, Onboard Scales and Smart Hitch as standard equipment. The Ford tracker says my truck has those options. A new Limited order has gone up $2000, probably to account for the added options. But my order contract is fixed. In hind sight, I’m glad it took 4 months to build the truck.
![]()
Awesome News! Grats.I got the built checkmark and it’s shipped!!
![]()
FX4 is not available in Limited trimDo you have the FX4 package? The onboard scale isn’t available on the FX4 package from what I’m told.
Congrats!!I got the built checkmark and it’s shipped!!
![]()