Newface
Well-known member
- Thread starter
- #1
Notes:
• Production Week at DTP: 12/2
• DTP: 25MY - Scheduling. (For reference review the Clean-up Notes)
• KCAP: No scheduling.
• Required Orders:
- 25MY DTP only content and Raptor/ Raptor R orders.
- 99D - 3.5L Hybrid Engine Orders.
• Limited Availability:
- 99P - 2.7L Engine.
- 998 - 3.5L Engine.
- 18D - 6" Extended Running Boards (Inc. on Bed Uitlity Pack (68L)).
• Production Week at DTP: 12/2
• DTP: 25MY - Scheduling. (For reference review the Clean-up Notes)
• KCAP: No scheduling.
• Required Orders:
- 25MY DTP only content and Raptor/ Raptor R orders.
- 99D - 3.5L Hybrid Engine Orders.
• Limited Availability:
- 99P - 2.7L Engine.
- 998 - 3.5L Engine.
- 18D - 6" Extended Running Boards (Inc. on Bed Uitlity Pack (68L)).
Sponsored