It would make sense to build the higher trims first because the leftover 2024 inventory at most dealers are lower trims.YES. I Believe all 24s have been scheduled at least for DTP. What does "no scheduling until okay to buy is achieved" mean?
So it looks like the 1st 25s to get built will be raptors. Wonder if 25 will be opposite of 24. In 24 many of the KR are being built late. As a 25 KR order holder hoping the build higher trims 1st.
I was wondering about that too (I'm totally new to Ford and their ordering process). I found this:YES. I Believe all 24s have been scheduled at least for DTP. What does "no scheduling until okay to buy is achieved" mean?