No idea what this means, but it's something new. Progress?
Sponsored
Does anyone know if the Tear Tag is populated it means the Truck is built? My BCE Modules are populated, but I don't have a Tear Tag yet.No idea what this means, but it's something new. Progress?
![]()
No idea what this means, but it's something new. Progress?
![]()
Does anyone know if the Tear Tag is populated it means the Truck is built? My BCE Modules are populated, but I don't have a Tear Tag yet.
Good questions - unfortunately, I don't know. I see I have information in the AsBuilt Tear Tag. I also just checked the Ford Tracker and now have a Delivery ETA of 2/21 to Chapman Ford of Horsham PA.Ford has updated my Vehicle Tracker. I now have an estimated delivery of 02/18/2022
Does anyone know if the Tear Tag is populated it means the Truck is built? My BCE Modules are populated, but I don't have a Tear Tag yet.
Is that anything like the mattress tags that you aren’t supposed to remove unless you are the end user?
|
Yeah, seems like it doesn't mean anything bad based on other threads. But the Tracker still shows that I'm "in Production" and still shows Estimated Delivery of 02/22/2022. Hoping everything is still on track.Here are the latest updates. Concerning the date at the very bottom center of the window sticker, I've read that it can change for no apparent reason and perhaps we shouldn't pay attention to it, which I admit can be hard. I just checked my Chapman order through the Ford tracker and it still reflects 1/19/2022. However, the Ford tracker no longer shows my production date as 1/25 and only indicates "In Production" and the Estimated Delivery has reverted back to "TBD" instead of 2/21/2022. My cancelled Koons order still shows in production 1/24/2022 with a delivery ETA of 1/19/2022., but the window sticker now shows today's date 1/26 instead of the original date of 1/18. The trucks are the same exact build. Who really knows what's going on? I think I'd prefer the window sticker date to change as long as all the other dates didn't change!
Name Des Trim Plant Eng BAP
Y/NOrig Order Date 2022
Convert DateBlend Date Seq# BCE Mod Chip
HoldShpd Method Del ETA Dlvr'd Date Rcvd
Y/NRalpL PA King Ranch DRB PB N 9/16/21 10/01/21 1/25 399/2392 X Convoy 2/21/22 N RalpL VA King Ranch DRB PB N 10/1/21 N/A 1/24 1104/1177 X Convoy 2/19/22 N bgator IA Plat DRB PB N 7//21 10//21 1/27 461/2363 Convoy N colorado
brandonIA Lariat DRB PB N 12/3/21 N/A N LD50 IL Lariat DRB PB N 11/22/21 N/A 1/27 536/2363 Convoy N Dan66 BC Lariat DRB PB Y 11/23/21 N/A 1/25 360/2392 Rail N PGPower
boostTX Lariat DRB PB N 10/11/21 10/28/21 1/27 179/2363 Rail N RossRR MN Lariat DRB PB N 11/18/21 N/A 1/26 1852/2392 Rail N Funke5.0 IA XL DRB 5.0
V8Y 10/2/21 N/A 1/28 2142/2363 Convoy N Jimbo
@007itMA Lariat KAN 3.5
EBN 11/28/21 N/A 1/24 943/1695 Convoy N Space
whitev8NJ XLT KAN 5.0
V8N 11/13/21 N/A 11/24 236/379 Convoy N stans
2000VA Lariat DRB 5.0
V8N 10/18/21 N/A 1/25 181/2392 X Convoy 2/18/22 N Bald Devil MO Lariat DRB PB N 11/22/21 N/A 1/25 849/2392 X Convoy 2/19/22 N bling
idingTN Lariat DRB 3.5
EBN 10/2/21 N/A 1/24 2/252 X Convoy 2/22/22 N llsjubal FL Lariat DRB PB N 11/22/21 N/A 1/25 1155/2392 Convoy N mrgoalie Plat DRB PB N 10/19/21 N/A 1/27 201/2363 Rail
Yeah, I just checked the website. My delivery changed from February 2nd to APRIL 30th!My delivery date just changed from 2/19/22 to 5/1/22. Time to hit the bottle!!?