it took a couple days after the Built date showed before the check box appeared. I do not have a bed liner or liners so nothing had to be done offsite that I know of. I would think those would add time.
Update: Now says built 5/18, and shipped 5/19. Delivery is still est. 6/15.
I had some of the options for delays.
10-way seats.
work area.
power running boards.
did not have:
spray in bed - figure do it when it arrives.
wheel well liners
My delivery date was bouncing before too. 6/14, 6/20, 6/15, 6/20, now 6/15.
I probable watch to close. You know the saying.
A watched truck is never built.
So ... My blend date was5/18. This morning the built date was checked and said 5/19 and in production was checked. Delivery ETA was 6/15.
Just looked again In Production says 5/18, but check is missing. No Built date and checkbox is missing. Delivery ETA still says 6/15.
Maybe the site...
Late to the club.
Mine is scheduled 5/20. Blend date is 5/18. ETA 6/14. 702A PB. Hoping window sticker updates soon. Ready the forums it seems it hit or miss if it does.