Sponsored

12/20/2021 Build Club

GolfR

Well-known member
Joined
Mar 24, 2021
Threads
2
Messages
344
Reaction score
313
Location
Maryland
Vehicles
2022 F150 KR PB
@22XLT Grats on the pickup! Great looking truck!

I couldn't wait any longer, so I emailed my dealer today for an update. System still shows a build date of 12/22 but he said it has not been marked as complete or shipped yet. So who knows. We'll probably get more information next week.
Im in the same boat. Dealer finally got back to me and they say that it went “to the plant” on the 15th with a scheduled build date of 12/20. There are no other updates in the system. Pending in palsapp, no modules populated, and the Fordpass app just shoWe the standard lightening picture.
Sponsored

 

poodwecker

Well-known member
Joined
Nov 27, 2021
Threads
0
Messages
45
Reaction score
56
Location
WA
Vehicles
2022 F150 XLT 302a
That’s the same thing Granger told me as well.

the only thing that has “moved” was the VIN now picked up in FordPass. Can’t activate it obviously, but that happened the day after my build day.
 
First Name
Erik
Joined
Dec 30, 2021
Threads
1
Messages
12
Reaction score
15
Location
Plainfield, IL
Vehicles
2022 Ford F-150
I’m in the 12/20 build week….here’s my info for the list:

XL, destination IA (Granger), ordered 11/26, received email on 12/2 confirming scheduled for production during week of 12/20, received built email confirmation on 12/24, received shipped email confirmation on 12/25. ETA for delivery to Granger is 1/10 - 1/16. If this holds I will be quite pleasantly surprised.
 

Erickson85

Active member
First Name
Andrew
Joined
Dec 8, 2021
Threads
0
Messages
42
Reaction score
57
Location
Pekin IL
Vehicles
21 F-150 (3.5EB, 302A CC short box)
Occupation
IUOE 649
Maybe all of your dealers spec'd 20's instead of the standard 18s.
Regardless, my Lariat with the max tow is coming with 18-inch wheels. Most people want 20s for looks and slightly better handling but I wanted more sidewall then looks.

The XLT with a 302a high and Max Tow comes with 20s.
The XLT base and Max Tow comes with 18's
The Lariat 500a standard and 501a mid with Max Tow come with 18's.
For some reason the Builder does not show a 502a option for the Lariat but I have heard people talking about it.
Darrell
Wouldn’t be the first time I’ve been wrong. U know what they say about assumptions. I didn’t realize there where multiple 18” options. Of course I haven’t been paying attention to the sport package trucks
.
 

TN Rotty

Well-known member
First Name
Mike
Joined
Sep 21, 2021
Threads
1
Messages
1,058
Reaction score
1,002
Location
Mid - TN
Vehicles
2022 F150 Crew Cab Plat 6.5'
I’m in the 12/20 build week….here’s my info for the list:

XL, destination IA (Granger), ordered 11/26, received email on 12/2 confirming scheduled for production during week of 12/20, received built email confirmation on 12/24, received shipped email confirmation on 12/25. ETA for delivery to Granger is 1/10 - 1/16. If this holds I will be quite pleasantly surprised.
Welcome and Congrats!

What plant was it built at? (11th VIN digit - F = Dearborn, K = Kansas City).

I've got you added and will update tonight.

Hopefully we'll see more info on all the builds this coming week.
 

Sponsored

Big&BadGTA

Well-known member
Joined
Oct 3, 2021
Threads
3
Messages
68
Reaction score
49
Location
East Coast
Vehicles
Cars, Trucks/SUVs, and Motorcycles
I just cannot understand why it takes 3+ weeks to "produce" a truck. Perhaps it's because of the spray bedliner? I lose interest every day...
 

Nasto

Well-known member
First Name
Neil
Joined
Nov 8, 2021
Threads
6
Messages
659
Reaction score
620
Location
Eagle, Idaho
Vehicles
2022 F-150 Lariat SuperCrew
I just cannot understand why it takes 3+ weeks to "produce" a truck. Perhaps it's because of the spray bedliner? I lose interest every day...
When I ordered my Lariat on 09/25/21, I was told by my dealer that the spray-in bedliner would hold things up, so I removed it from the order and am having the dealer do it after delivery. I actually negotiated with them to throw it in for free.

Also, 12/20 is a tough build week because of the holidays and a short week. I got bumped from 12/20 to the week of 01/03/22 and still no build day or window sticker and it's 3 days away. My dealer did warn me that the whole process would take 3-4 months and that's if no shortage of parts. Fun times!
 

TN Rotty

Well-known member
First Name
Mike
Joined
Sep 21, 2021
Threads
1
Messages
1,058
Reaction score
1,002
Location
Mid - TN
Vehicles
2022 F150 Crew Cab Plat 6.5'
Sorry for omitting that, it was built at Dearborn.
No worries - you had everything else posted - that was helpful!

I just cannot understand why it takes 3+ weeks to "produce" a truck. Perhaps it's because of the spray bedliner? I lose interest every day...
I saw a post where a truck on the 11/29 build week was just shipped a few days ago. No factory liner - dealer liner. I think the factory liner work seems to be keeping up with production and maybe delaying a a day or two. There are other delay issues it seems.
 

ws6transam

Member
First Name
Daniel
Joined
Dec 27, 2021
Threads
1
Messages
23
Reaction score
30
Location
Bath, Michigan
Vehicles
2022 F150 XLT, C7 Corvette, 1984 Pontiac TransAM
Occupation
Seismotectonics Research Engineer
Hi all,
Cliff's notes:
Atlas Blue / Baja Tan cloth F150 supercrew XLT Chrome appearance pkg, 302A equipment group, w/ Max-trailer Tow package , spray-on bedliner, and tonneau cover.
Ordered on August 25th, then converted to a 2022 order on 10/25.

Email from FORD received on Friday, November 12, 2021 at 5:25:42 PM:
stating build week of 20-DEC-2021, with VIN assigned: 1FTFW1E89NKD00113

Email from FORD received on 30DEC2021 at 2:52 PM with notification that truck was built,
with estimated delivery to dealership between 08 JAN2022 through 14JAN2022 .

Dealership has confirmed today that it is has left Kansas City, MO and is in transport system.
 

Sponsored


TN Rotty

Well-known member
First Name
Mike
Joined
Sep 21, 2021
Threads
1
Messages
1,058
Reaction score
1,002
Location
Mid - TN
Vehicles
2022 F150 Crew Cab Plat 6.5'
Hi all,
Cliff's notes:
Atlas Blue / Baja Tan cloth F150 supercrew XLT Chrome appearance pkg, 302A equipment group, w/ Max-trailer Tow package , spray-on bedliner, and tonneau cover.
Ordered on August 25th, then converted to a 2022 order on 10/25.

Email from FORD received on Friday, November 12, 2021 at 5:25:42 PM:
stating build week of 20-DEC-2021, with VIN assigned: 1FTFW1E89NKD00113

Email from FORD received on 30DEC2021 at 2:52 PM with notification that truck was built,
with estimated delivery to dealership between 08 JAN2022 through 14JAN2022 .

Dealership has confirmed today that it is has left Kansas City, MO and is in transport system.
Welcome and Congrats! - I'll get the new list up tonight with your info added.
 

Truck21

Member
Joined
Dec 31, 2021
Threads
0
Messages
24
Reaction score
35
Location
Alabama
Vehicles
07 Tacoma, 18 Jeep Grand Cherokee
Anybody else add the upgraded B&O sound system to their Truck? I’m wondering if that could be slowing mine down. Build week of 12/20 but haven’t received an email since then. No modules and not able to track through ford. Still “in production”.
 

Nasto

Well-known member
First Name
Neil
Joined
Nov 8, 2021
Threads
6
Messages
659
Reaction score
620
Location
Eagle, Idaho
Vehicles
2022 F-150 Lariat SuperCrew
Anybody else add the upgraded B&O sound system to their Truck? I’m wondering if that could be slowing mine down. Build week of 12/20 but haven’t received an email since then. No modules and not able to track through ford. Still “in production”.
I went with B & O Unleashed. Didn’t seem to raise any red flags with my dealer.
 

TN Rotty

Well-known member
First Name
Mike
Joined
Sep 21, 2021
Threads
1
Messages
1,058
Reaction score
1,002
Location
Mid - TN
Vehicles
2022 F150 Crew Cab Plat 6.5'
Anybody else add the upgraded B&O sound system to their Truck? I’m wondering if that could be slowing mine down. Build week of 12/20 but haven’t received an email since then. No modules and not able to track through ford. Still “in production”.
I would assume it's normal delivery stuff this time of year & not the radio . The tracker has been down for MY22s since before they were built. If you let me know:

Destination state (dealer)
Plant (11th letter of VIN - F = Dearborn, K = Kansas City)
Trim
Original Order date
Build date is 12/20
and any spray in liners, covers, wheel well covers, or worksurface?

I can add you to the list. We've got 21 trucks in build week 12/13 and 39 in build week 12/20.
 

Truck21

Member
Joined
Dec 31, 2021
Threads
0
Messages
24
Reaction score
35
Location
Alabama
Vehicles
07 Tacoma, 18 Jeep Grand Cherokee
I would assume it's normal delivery stuff this time of year & not the radio . The tracker has been down for MY22s since before they were built. If you let me know:

Destination state (dealer)
Plant (11th letter of VIN - F = Dearborn, K = Kansas City)
Trim
Original Order date
Build date is 12/20
and any spray in liners, covers, wheel well covers, or worksurface?

I can add you to the list. We've got 21 trucks in build week 12/13 and 39 in build week 12/20.
That would be great. Here are my 22MY order details.
Destination state: Alabama
Plant: Dearborn
Trim: XLT Sport
Order date: 11/29
Build week: Scheduled for week of 12/20 (No updates as of yet)
Only add-ons were the B&O sound system & the sport appearance package.
Sponsored

 
 







Top