Newface
Well-known member
- Thread starter
- #1
Order Bank Open/Close
Stock 2024: Open
Retail 2024: Closed
Stock 2025: Opening on 8/26
Retail 2025: Opening on 8/26
Notes:
• Production Week: 9/30.
• The Heads-up Display is restricted and standard on most high series. If you want high-series, please consider ordering: 401A, 501A, or 701A.
• SIMS orders were created this weekend for F-150. Please review and amend orders, as necessary.
• Orders required:
- Dealers with Raptor and Raptor R allocation must submit Raptor orders 801A & 803A respectively, without Tonneau Cover (96T, 96J, 96X).
• Key Dates:
- Final expected order commit due date for balance out: 9/5 (subject to change if the plant reaches capacity before this date).
- Spec Changes and cancellations will shut off on - 8/29.
Limited Availability:
- 99P - 2.7L Engine
- 99D - 3.5L Hybrid
- 642 - 20" Dark Gray W/ Machined Alum Wheels Std. on STX
- T2P - 275/60/20 BSW All-Terrain -Tire Std. STX 200A; Inc. XLT Black Pack + (19P)/ Lariat Black Pack (195); Platinum 701A & 702A
Stock 2024: Open
Retail 2024: Closed
Stock 2025: Opening on 8/26
Retail 2025: Opening on 8/26
Notes:
• Production Week: 9/30.
• The Heads-up Display is restricted and standard on most high series. If you want high-series, please consider ordering: 401A, 501A, or 701A.
• SIMS orders were created this weekend for F-150. Please review and amend orders, as necessary.
• Orders required:
- Dealers with Raptor and Raptor R allocation must submit Raptor orders 801A & 803A respectively, without Tonneau Cover (96T, 96J, 96X).
• Key Dates:
- Final expected order commit due date for balance out: 9/5 (subject to change if the plant reaches capacity before this date).
- Spec Changes and cancellations will shut off on - 8/29.
Limited Availability:
Sponsored