Sponsored

Recent content by Will_NY

  1. Fox Shocks - Towing Quality ?

    Hi all - Was wondering if the Fox 2.0 shocks are decent for towing a 5-6k trailer? Will is be to soft of a shock for trailering? Currently have a 2024 F-150 Fox 2.0, with 34's, will be getting a travel trailer soon. Thanks !
  2. 2022 CCD shocks ride like crap?

    Use this setup: https://shockdeletes.com/ These replace the CCD modules. I have zero issues no lights, etc..
  3. 2022 CCD shocks ride like crap?

    Agreed. Just a nice option if you need to run larger wheels and tire setups..
  4. 2024 F150 King Ranch with CCD/BC Leveling Kit

    Just remove the CCD shocks and replace them with Aftermarket - Pucks are not the way to go on the CCD.
  5. 2022 CCD shocks ride like crap?

    Just remove the CCD Shocks and replace with aftermarket. I pulled mine CCD shocks and replaced them with Fox 2.0 - World of a difference.
  6. 2024 Platinum - Wheels and Tire setup

    Anyone get around to level and throw on new wheels and tires on a 2024 Platinum yet? I've haven't seen any posts on this trim level. Curious how it looks with 34's or 35's.
  7. 2024 EQUIPMENT GROUP 701A Platinum

    Same thing happened to me. Did you ever change out the CCD shocks ? If it is even possible..
  8. Build week 4/29 -5/6

    What was turn around time from hitting the dealer to ready for pickup?? Congrats!!
  9. Ford Incentives after 7/8 ???

    Anyone hear buzz about Ford incentives after 7/8 ? Hoping they drop down on the rates...
  10. 2024 F-150 Platinum Long Box - Avalanche Gray

    Looking good ! What leveling lit did you use? Did the ride change any ?
  11. Incentives based on ZipCode

    How does incentives work for APR and Cash back on Zip Codes? Is it the dealer's location zip or the buyer's location zip? Buying out of state this time around.. Thanks !!
  12. BedRug for PAT Tailgate?

    Anyone know if BedRug will make an option for the PAT tailgate soon? Thanks !
  13. Build week 4/29 -5/6

    Sorry to hear.. I'm shipped on Rail to KC for over a week.. Dates are moving all over the place. Hope this week gets Delivered to Granger.
  14. Build week 4/29 -5/6

    Good and Bad news today.. Got on the Rail today... heading to KC now.. but... pushed ETA out another week on delivery.. I'll take any movement IMO..
  15. Build week 4/29 -5/6

    No movement on Tracker.. location - "Area 58". Last update 5/29




Top